Luxury Wetroom - Cefn Coch
This project included -
Building and Carpentry
- Removing existing bathroom suite
- Breaking concrete and digging down for installation of wet room former
- Digging down and making alterations to the below ground waste pipework
- Filling back in and making good
- Self-levelling the entire floor area
- Erecting studwork to accommodate new pipework
- Insulate studwork and roof space above bathroom
- Fitting new bathroom accessories
Plumbing
- Removing existing plumbing items
- Renewing pipework to suit new positions of bathroom items
- Making alterations to the position of the incoming water main
- Installing new and existing bathroom items in new positions, including -
- Basin
- Radiator
- Mixer shower
- Fixed panel shower screen
Tiling
- Waterproofing shower area with a tanking kit
- Tiling the walls and floor with large porcelain tiles
Electrics
- Removing all existing electrical items
- Installing new wiring to suit new positions
- Installing new and existing items in new positions including -
- Electric underfloor heat matting with programmer
- Electric towel radiator with programmer
- Suitable waterproof light
- Bathroom fan - terminating through slate roof
Plastering
- Plaster boarding all walls and ceiling
- Skimming entire ceiling area
Painting
- Painting ceiling with a white bathroom paint
Back