Luxury Wetroom - Cefn Coch

This project included -

Building and Carpentry

  • Removing existing bathroom suite
  • Breaking concrete and digging down for installation of wet room former
  • Digging down and making alterations to the below ground waste pipework
  • Filling back in and making good
  • Self-levelling the entire floor area
  • Erecting studwork to accommodate new pipework
  • Insulate studwork and roof space above bathroom
  • Fitting new bathroom accessories

Plumbing

  • Removing existing plumbing items
  • Renewing pipework to suit new positions of bathroom items
  • Making alterations to the position of the incoming water main
  • Installing new and existing bathroom items in new positions, including -
    • Basin
    • Radiator
    • Mixer shower
    • Fixed panel shower screen

Tiling

  • Waterproofing shower area with a tanking kit
  • Tiling the walls and floor with large porcelain tiles

Electrics

  • Removing all existing electrical items
  • Installing new wiring to suit new positions
  • Installing new and existing items in new positions including -
    • Electric underfloor heat matting with programmer
    • Electric towel radiator with programmer
    • Suitable waterproof light
    • Bathroom fan - terminating through slate roof

Plastering

  • Plaster boarding all walls and ceiling
  • Skimming entire ceiling area  

Painting

  • Painting ceiling with a white bathroom paint

 

Back