Shower room - Trewern

This Project included -

 Building and Carpentry

  • Removing existing shower suite
  • Fitting ply / plasterboard to walls where removed for pipework alterations
  • Fitting new chipboard flooring removed for pipework alterations
  • Over boarding chipboard flooring with plywood ready for vinyl flooring
  • Installing new multi-panel boards within the shower area
  • Fitting new vanity unit with basin
  • Boxing in all pipework with plywood and fitting new skirting boards ready for painting

Electrics

  • Removing existing electrics
  • Installing new wiring to suit new positions of electrical items
  • Installing new electrical items including -
    • Sealed light unit
    • Electric shower
    • Bathroom fan

Plumbing

  • Removing existing plumbing items
  • Renewing plumbing to suit new position of bathroom items
  • Installing new and existing plumbing items including -
    • Comfort height toilet
    • Vanity basin
    • Quadrant shower tray and screen
    • Electric shower
    • Radiator

Tiling

  • Tiling walls using small white "brick-effect" tiles

Flooring

  • Fitting vinyl cushion flooring over the entire floor area

Back